Pages

Friday, January 10, 2014

Repair of roads in Focal Point: PSIEC will bear entire expenses

Fri, Jan 10, 2014 at 5:11 PM
PSIEC Chairman Shakti Sharma assured industrialists
Focal Point Welfare Association Facilitated and Honored Shakti Sharma 
Ludhiana: 9 Jan 2014: (Rector Kathuria//Punjab Screen): 
Sh. Shakti Sharma said that remaining main roads of Focal Point, Ludhiana which are in bad condition and need heavy repairs will be constructed on RCC pattern. PSIEC will bear entire expenses on construction of these concrete roads. He informed that PSIEC had already spent Rs. 18 Crores for constructions of RCC roads in Focal Point, Ludhiana.
Sh. Sharma further said that power distribution system requiring immediate repair of electric poles and wires for bringing required improvement in supply of power to industrial units will be taken up with the Chairman Punjab State Power Corporation Limited on priority basis. He assured the Industrialists that all Departmental Heads of State Govt. will be requested for releasing adequate funds under their schemes for bringing all round development and uplift of infrastructure of Focal Point, Ludhiana. All out Efforts will be made to fix time frame for different works.
The key members of Focal Point Welfare Association brought to the kind notice of Sh. Sharma regarding the precarious condition of main roads, power supply and infrastructure of Focal Point, Ludhiana. This meeting was attended by Sh. Manjit Singh Khalsa Chairman & Sh. Kulwinder Singh Benipal President Focal Point Welfare Association Ludhiana, Sh. Ajit Singla, Sh, Rajesh Lakra, Sh. Amrik Singh Marshal, Sh. Raju Garg, Sh. Amrit Jain, Sh. Brij Mohan and other prominent industrialists.

These industrial leaders expressed confidence that Sh. Sharma would handle the affairs of PSIEC in a smooth, effective and transparent manner.
(Kulwinder Singh Benipal)
PRESIDENT

No comments:

Post a Comment